Skip to main content

Green Solution Products

Innovation Zero 2024 Main Stage

29 Aug 2024

Qwello

Qwello's Own Designed and Manufactured Charge Points

Qwello UK partners with Doddington Hall to provide EV charging solutions

  • Qwello's Own Designed and Manufactured Charge Points
  • Qwello's Own Designed and Manufactured Charge Points
  • Qwello's Own Designed and Manufactured Charge Points
  • Qwello's Own Designed and Manufactured Charge Points
  • Qwello's Own Designed and Manufactured Charge Points
  • Qwello's Own Designed and Manufactured Charge Points
Qwello's Own Designed and Manufactured Charge Points Qwello's Own Designed and Manufactured Charge Points Qwello's Own Designed and Manufactured Charge Points Qwello's Own Designed and Manufactured Charge Points Qwello's Own Designed and Manufactured Charge Points Qwello's Own Designed and Manufactured Charge Points
Description

●      OZEV approved AC 7kW to 22kW cabled or socketed charging

●      Dual 7-22kW (CP21/CP22) or single outlet 7-22kW (CP05/CP06) hardware to suit on-street and destination applications. All hardware is independently CE Certified.

●      Integrated 6.5m retractable cable for driver convenience, cable security, and to minimise trip hazards (CP05/06)

●      Compliance with BSI PAS 1899:2022 standard for disabled access

●      Integrated payment via contactless credit/debit cards, Apple Pay, Google Pay, App, and RFID enabling comprehensive payment options without the need for memberships or commitments

●      Automatic touch-free authentication and session initiation

●      Integrated parking sensor to detect nuisance parking

●      Reservation feature

●      Free smartphone app with integrated navigation features, live charge point status and user session status

●      Unique modular design for optimised maintenance and increased operational uptime

●      Scalability per site

●      Dynamic load balancing and power budgeting

●      In-house 24/7/365 multilingual customer service

●      Optional Wi-Fi or 5G antenna integration

●      Optional integration of air quality sensors to record environmental data

●      V2X ready - CP21 and CP22 are ISO15118 compliant

●      OCPP 2.0.1 and OCPI 2.2.1 compatibility

●      IP54 housing with IK10 impact resistance

●      Slimline hardware for minimal impact on street environments

●      Optional integrated feeder pillar to reduce street cluttering and installation costs.

Qwello has recently achieved a significant milestone in its commitment to environmental responsibility by obtaining ISO 14001 certification. This internationally recognised standard demonstrates our dedication to reducing our environmental impact across all operations. ISO 14001 sets the framework for effective environmental management, ensuring that we implement best practices for sustainability, from reducing waste and managing resources efficiently to minimising our carbon footprint during the installation and operation of EV charging infrastructure. This certification reflects our proactive approach to environmental stewardship and aligns with our broader mission of driving the transition to a low-carbon future through sustainable electric vehicle charging solutions.

 

Overview
  • Qwello utilises GSM antennas to ensure connectivity to the back office achieving a >99% availability.
  • Qwello charge points have an integrated bay sensor to provide reliable data to the Qwello App.
  • The Qwello Apps simplicity and user-focused design guarantee a seamless charging experience.
  • Qwello's CP05 charge point allows for the integration of air monitoring equipment, reducing street furniture and supporting air pollution reporting.
Contact

Qwello's Own Designed and Manufactured Charge Points
Description

Following the successful rollout of 49 charge points for The City of London Corporation and the current rollout of 200 plus charge points in Solihull and the county of Essex, Qwello is pleased to have completed the installation of five CP05 charge points in the historic grounds of Doddington Hall estate; with future reading already in place for five additional charge points as utilisation increases.

Situated in Lincolnshire, and built between 1595 and 1600, Doddington Hall was designed by Robert Smythson - one of England’s foremost Elizabethan architects. 

The charge points are located in the new car park near the Grain Store Café, Restaurant & Bar and are now open to the public.

Qwello's charge points are the latest addition to the estate’s long term commitment to ensuring a sustainable future for Doddington which includes harnessing biomass and solar sources to power the Hall, shops, cafés and holiday cottages, free walking routes on the estate and the creation of a traffic free cycle track connecting to Lincoln. This aligns with Qwello's proactive approach to environmental stewardship and is a project we are proud to have delivered.

We are pleased to work with Qwello to install five fast electric vehicle chargers at Doddington. Being an electric car owner myself, we aim to make it easier for the growing number of electric vehicle users who visit Doddington to experience the beauty and heritage of the estate without worrying about their car charge. The chargers not only provide visitors with a practical and convenient way to charge their electric vehicles while they enjoy everything that the Doddington Estate has to offer, but they are also another important step forward for our continued commitment to sustainability.
James Birch
Partner of the Doddington Hall Estate
View all Green Solution Products
Loading